PUBLIC WORKS

Sarrià Station Gallery UTE Line-9 Metro

Since 2025


Drilling with a jumbo and controlled blasting with electronic detonators in a gallery measuring 19.60 m wide at the base, 18 m high at the keystone, and 13 m long. Vibration control and monitoring. Drilling and installation of support bolts.