DEMOLITIONS

Cooling Tower Demolition in Andorra, Teruel

2022


For the first time in Spain, three cooling towers, each 107 meters high and 83 meters in diameter, were demolished simultaneously. 270 kilos of explosives were embedded in the 402 holes drilled into each tower.